Tank and Drum, Sheffield

A Phase 1 environmental report was undertaken to assess the risks to sensitive receptors both on and off-site due to soil and groundwater contamination as a result of the proposed development.

The site was used for washing shot blasting, re-spraying and re-lacquering steel drums. This was undertaken under an exemption, however due to a change in regulations a licence is now required.

It was proposed to also undertake washing of IBC’s and an additional area was being prepared for shredding and granulation of non-hazardous plastics.