Brief:
Conduct a phase 1 environmental report
Project:
The proposed development was to demolish a garage and construct a 3 storey residential building with soft landscaping.
Call us on 020 8291 1354
or email askgo@gosolve.co.uk
1 May 2019
Brief:
Conduct a phase 1 environmental report
Project:
The proposed development was to demolish a garage and construct a 3 storey residential building with soft landscaping.