Russell + May Associates

Brief:

Conduct a phase 2 geoenvironmental investigation, devise a remediation strategy and complete a phase 4 verification report.

Project:

A phase 1 environmental report was not required as it had already been determined that a phase 2 investigation would take place due to the presence of a chalk quarry adjacent to the rear boundary of the site.  The proposed re-development of the site was to provide two semi-detached residential dwelling houses with private gardens