Sanctuary Group (London & SE)

Brief:

We were tasked with completing phase 1 desktop studies for 19 sites throughout Haringey.

Project:

Sanctuary Group were in negotiation to obtain a number of infill sites of various size and condition for residential development.

Within a very challenging time frame a phase 1 environmental report was completed for each of the 19 sites with advice on the phase 2 intrusive investigation required to determine the extent of any potential contamination on the identified sites.